Projects

Garland W.A.N.

  • TSU installed 16 miles of over head and underground fiber optic cabling allowing for high speed internet access for the residents.

Brazos Ridge Estates

  • 4,000’ of 6” SDR-21 PVC
  • 2,000’ of 4” SDR-21 PVC
  • 45 water services

Rocky Creek Ranch

  • Installed 37,000’ of ditch and conduit
  • 15 PMH-9 switchgears
  • 113,000’ 1/0 primary

Watter Creek

  • 1,000’ of 6” Poly gas pipe
  • 6,000’ of 4” Poly gas pipe
  • 10 service connections

Underground Services

  • 52,000 Electrical serives installed in the past 3 years
  • Ongoing leak repair and replacement for ATMOS

Dripping Springs, Tx

  • Installed over 5 miles of gas piping to serve the City of Dripping Springs that previously did not have natural gas available.
  • Installed natural gas and electric infrastructure for more than (150) new sub-divisions in the past 2 years.

Hwy 121 “Sam Rayburn Toll”

  • Relocated over 13,000’ of gas pipe

Marlin, Tx

  • Installed over 17 miles of 6” gas pipe

North Tarrant Express “NTE"

  • Relocated over 4 miles of gas piping

Frost, Tx

  • Installed over 1 mile of PA11 pipe